BIM LEVEL OF DEVELOPMENT (LOD)

Level of Development (LOD) in BIM defines the degree of completeness, reliability, and detail of a model element at various stages of a project.
It helps project teams understand how much information a BIM element contains and how it can be used for design, construction, and facility management.

Each LOD represents a specific stage of model accuracy and data richness, ensuring that all stakeholders share the same expectations regarding model content and usability.


LOD 100 – PRE-DESIGN

  • The element is represented graphically as a symbol or mass without precise geometry.
  • Used for conceptual design and early project studies.
  • Quantities, size, shape, and location are approximate.

LOD 200 – Schematic DESIGN

  • The element is modeled with approximate geometry and generic information.
  • Represents the general shape, size, and location.
  • Used for design development and early coordination.
  • Information may include system type or approximate quantities.

LOD 300 – DESIGN DEVELOPMENT

  • The element has accurate geometry and location.
  • Suitable for coordination, clash detection, and documentation.
  • Quantities, dimensions, and positions are precise.
  • Typically used for construction drawings and permit documentation.

LOD 350 – Construction Documentation

  • The element includes interfaces and connections with other building components.
  • Used to coordinate structural, mechanical, and architectural systems.
  • Allows for more accurate construction sequencing and installation planning.

LOD 400 – CONSTRUCTION STAGE

  • The element is modeled as it will be fabricated and installed.
  • Contains detailed geometry, material specifications, and production data.
  • Used by contractors and manufacturers for prefabrication and on-site construction.

LOD 500 – As-Built

  • Represents the final, constructed condition of the element.
  • Geometry and data match the actual built asset.
  • Used for facility management and maintenance.

In Summary:

LOD Stage Description
100 Conceptual Symbolic representation, approximate data
200 Schematic Generic geometry and information
300 Detailed Design Accurate geometry, suitable for coordination
350 Construction Docs Includes interfaces and connections
400 Fabrication Fully detailed for manufacturing and installation
500 As-Built Reflects the real, built condition